Nullify

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Campaigns

The patch gap
is where breaches live.

Detection is solved. Your backlog lives in the last mile: owning, patching, getting it merge-ready, chasing it to merge. Campaigns runs that last mile for you, finding by finding, edge case by edge case.

Attackers move at machine speed.
Remediation still moves at human speed.

Exploit
5 days
Patch
← the patch gap · exposure →
60+ days
~60%of breaches use a
known vulnerability
$0.17to weaponise a known CVE,
exploited in under 5 days
100 : 1developers to security
engineers on a typical team

Sources: NVD disclosure data · ISC2 2025 Workforce Study

Why the last mile is hard

Six Questions Stand Between a Finding and a Fix

None of them are model problems. Each needs context about your organisation, and today a person answers every one, for every finding, every time.

01estate · cloud

Which findings deserve a deeper look?

TodayEvery finding costs the same.
NullifySpend follows exposure and business sensitivity.
02exploit · runtime

Is this actually exploitable here?

TodaySeverity guesses, argued line by line.
NullifyProven against the running context.
03policy

What rule governs this team and app?

TodayOne global rule, argued by every team.
NullifyPolicy lives in Vault as the control plane.
04ownership · load

Who owns it, and who has capacity?

TodayWhoever last touched the file.
NullifyResolved when the fix is raised, weighed against workload.
05repo · ci

Will this pass review and CI?

TodayRewritten by hand, or a dead red branch.
NullifyWritten to repo conventions, refined from CI logs until green.
06slack · jira

Who to chase, and when to escalate?

TodayPinged by hand until someone gives up.
NullifyNudged in Slack, escalated on the SLA clock.

Six answers, every finding. This is the MTTR your program is measured on.

The manager agent

Work Flows Through the Manager

Detection gets you findings. Everything below the manager is the work your team would otherwise do by hand. Each lane is a tool, the context it reads, and the metric it moves.

UpstreamDetectionTriageEnrichmentExploit validation
The Managerplans the day, then executes it
01Read current state
02Sort the backlog
03Select inside the caps
04Execute, review, replan
05Close out on budget
The last mile · tool, context, limitmetric moved
Merge-ready fix PRrepo context · CI logsmerge-ready rate
Reviewer routingorg chart · capacityrouting
Ticket placementteam map · policythroughput
Stale PR recoveryPR age · CI statebacklog
Escalationownership · SLASLA

A tracker tells you what was assigned.
Nullify tells you what is moving.

Owners change, builds break and PRs go quiet. Nullify watches every fix through to merge, and every answer names the evidence it came from.

Ticket boardStale

A ticket is filed once.

Accurate the day it was assigned.

Last updated 14 days ago
SEC-1284 · paymentsin progress
SEC-1291 · identityin progress
SEC-1302 · billingto do
SEC-1310 · checkoutunassigned
NullifyLive

Nullify drives each one.

Updated by the work itself.

Last updated just now
PR #1284 · paymentsMerge-ready
PR #1291 · identityCI fixed · in review
PR #1302 · billingEscalated · SLA 4h
PR #1310 · checkoutReassigned · owner left
Why hasn't the payments fix merged yet?

CI failed on a sync caller. Nullify read the logs, pushed a follow-up commit and every check now passes. Priya has review capacity today and it's in her queue.

Sources
GitHub ActionsGitHubJiraSlack
PR #1284 · fix/auth-bypassread · just now
The patch gap

Your Backlog Lives in the Last Mile.

Find · solved
Fix · the patch gap, where breaches live
solved

Detect, triage, validate

You have bought this several times over. Most tools stop here.

then

Write the patch

Generated with repo context, in the team’s own conventions.

Backlog
then

Assign the owner

Routed to the developer who owns the code and has the capacity.

Routing
then

Get it merge‑ready

A patch that breaks the build never merges. Refined from CI logs until green.

Merge-ready rate
and finally

Chase until merged

Escalated in Slack on the SLA clock, so the PR doesn’t just sit there.

SLA
Nullifyautomates the fix, end to end.
Close the patch gap →

Tokens in, outcomes out

→ open vulnerabilities in one quarter · HealthTech
hrsreturned from triaging false positives · Retail
%of generated patches merge-ready · Media
vulnerabilities fixed and merged, across customers
Works with

The Last Mile Starts With Proof

Campaigns only drive work that is worth driving. Every finding arrives proven and ranked before the manager agent takes it to merge.

Fewer tickets, with the riskiest work first

What your team works onShare of open findingsState
Nullify
in a campaign
Prioritized backlog
scored
Raw findings by CVSS
unranked

Illustrative example. Real ratios depend on your backlog.

5
finding sources in one backlog: code,
secrets, cloud, supply chain and pentest
0–100
score on severity, exploitability,
reachability and business impact

Move from ticket queues
to campaigns with an objective

Campaigns

Work grouped by outcome

Campaigns are built from real findings, such as eliminating leaked secrets or upgrading CVE-affected dependencies. You set the scope and the level of automation.

Campaign · Eliminate leaked secrets
scope secrets · all repos · severity ≥ high
Automation level · open PRs and file tickets
progress 31 resolved · 9 remaining
Linked to this quarter's security goal
Assignment
✓Routed to @m.alvarez. Fewest open reviews on the team.
capacity · payments team
@m.alvarez · 2 open ✓
@priya-k · 6 open
@ops · other team · needs approval
Ownership

Assigned by ownership and capacity

Owners come from CODEOWNERS, commit history and service metadata, and assignment accounts for the open PRs and tickets each person already has.

From one backlog to a closed campaign

Each step turns findings into owned, tracked work. Nothing moves across teams without approval, and anything that stalls gets escalated.

01
Detect
02
Decide
03
Execute
04

Reported

Track MTTR, current finding counts, campaign progress, per-team progress and SLA compliance.

On trackUpgrade CVE-affected dependencies
Goal Q4 · cut critical exposure
MTTR · 6 days
Resolved · 42 of 50
SLA compliance · 96%
Per-team progress includedReported

Stalled work gets escalated instead of forgotten

When a security PR or ticket stalls, Nullify escalates in Slack, by DM or in a channel, with the risk and the SLA stated. Actively exploited vulnerabilities that affect your stack move up the backlog.

Nullify · threat watch
→ actively exploited CVE · affects jsonwebtoken
→ 3 repos affected … moved to the top of the backlog
Slack · #security-escalations
Nullify9:30 AM

PR #1292 has waited 4 days for review. It fixes an actively exploited CVE in ledger-api, with 2 days left on its SLA. @priya-k, can you take a look?

Ticket · Jira
In progressSEC-412 · payments team
Upgrade jsonwebtoken in 3 services
nullify filed this ticket

Part of the campaign Upgrade CVE-affected dependencies. Owners come from CODEOWNERS, and the fix PRs are linked below.

campaignSLA · 7 daysowner
›_ campaign status3 repos
1  payments-api · PR #1290 · merged
2  orders-api · PR #1291 · in review
3  ledger-api · PR #1292 · stalled 4 days
   # escalated in #security-escalations

A ticket queue tracks work, while Nullify runs the program around it

Rank one backlog

Code vulnerabilities, leaked secrets, cloud misconfigurations, supply-chain risks and pentest findings, scored 0–100 in one list.

Run campaigns
Respect guardrails
Report on goals
Backlog · all sourcesLive
FindingSourceScoreOwner
Leaked AWS key · configsecrets94@j.chen
Auth bypass · sessionpentest91@priya-k
Public S3 bucket · logscloud77@ops
Outdated library · utilscodescoring…—
Works with

Built on findings that are already proven

The manager agent

The Edge Cases Are the Job

Opening a pull request is easy. Getting it merged means handling everything that goes wrong after. The manager reads your platforms, catches each case and resolves it, without a human chasing.

Edge caseWhat the manager doesReads fromMoves
The fix breaks the build

Reads the CI logs, finds the cause and pushes follow-up commits until checks pass.

GitHub ActionsCI logs
Merge-ready rate
Merge conflict with main

Rebases onto the latest main and re-validates the fix before asking for review again.

GitHubGitLab
Merge-ready rate
The owner left or the team reorged

Re-resolves ownership from the org chart and code owners, then reassigns to whoever owns the path now.

CompassCODEOWNERS
Routing
Ticket in the wrong project

Moves it to the team that owns the service, following your team map and ticketing policy.

JiraLinear
Routing
Reviewer has no capacity

Balances by review load and sprint capacity, so work lands with someone who can take it this week.

JiraGitHub
Throughput
The PR goes stale

Notices the silence, nudges the reviewer, refreshes the branch and keeps it moving.

GitHubSlack
Backlog
The SLA is about to slip

Escalates to the right person in Slack with the finding, blast radius and fix attached.

SlackSLA policy
SLA
The fix touches shared code

Flags the blast radius and requests sign-off from every affected owner before merge.

CODEOWNERSSlack
SLA

Frequently Asked Questions

Why not build this ourselves?

The first 20% is an agent. The other 80% is context, the last mile and someone to own it indefinitely: ownership, capacity, ticket placement, stale PRs, CI repair and escalation, each with its own tool and limit.

Will campaigns flood developers?

No. Campaigns pace pull requests against each team's capacity and route each one to its owner, so work lands when it can be taken.

Who makes the final call?

Your engineers. Nullify prepares a green, evidenced pull request and escalates the judgment calls; a human always approves the merge.

What is security program management in Nullify?

It is the part of Nullify that runs your security program: it maintains one prioritized backlog across every capability, monitors emerging threats, knows who owns what and how much they already have on their plate, and drives work to completion through campaigns — opening PRs, filing tickets, nudging and escalating.

Which findings can a campaign target?

Campaigns cover code, dependency, container, secret and pentest findings, and can be scoped by finding type (specific CWEs or CVEs), repository, team, individual, severity, or a combination.

Does Nullify act without approval?

Only within the boundaries you set. A security leader decides each campaign's scope and automation level, ground rules and blocked action types limit what Nullify can do on its own, it won't move work across teams without approval, and it raises an action item whenever it needs a human decision.

What does it report on?

Mean time to remediate (MTTR), current finding counts, and campaign progress — resolved versus remaining, per team, with SLA compliance.

Close the patch gap

Take your vulnerability backlog all the way to merge

The AI harness that finds, proves and fixes vulnerabilities, then runs campaigns until each fix merges.